Fictional worked example · 01

From RFP source to a reviewable result

Follow one fictional Chinese-language procurement through requirement extraction, internal consistency checks and draft generation. Download the source files and inspect the outputs yourself.

RFPAI product example and instructions · Updated 2026-11-03

Understand the scope of this example

A two-page Chinese RFP contains 16 mandatory clauses. A separate two-page bid has eight planted issue categories producing nine alerts: incident response and resolution deadlines are reported separately. All organizations and projects are fictional. This single example does not establish accuracy, completeness or eligibility for real bids.

The source PDFs, quoted evidence and exported examples remain in Chinese so you can verify the original wording. This is not an English-language benchmark.

1. Download sources and sample outputs

2. Inspect all 16 extracted clauses

Open matrix tool →

These are source excerpts from this sample. They do not mean that a bidder has satisfied the requirements.

IDOriginal requirementSourceStatus
1投标人必须提供有效的营业执照复印件,作为资格附件。第1.1条
p.1
Pending
2投标文件必须附法定代表人授权书,并填写授权代表姓名;不得用通用承诺书替代。第1.2条
p.1
Pending
3本项目不接受联合体投标,投标人不得转包本项目。第1.3条
p.1
Pending
4含税总报价不得超过人民币200000元。必须提供分项报价,分项合计与总报价必须一致。第1.4条
p.1
Pending
5投标有效期必须为自2026年11月20日起不少于90日。第1.5条
p.1
Pending
6交付期限必须为合同签订后30个日历日以内,包含安装和测试。第1.6条
p.1
Pending
7设备必须提供不少于36个月的免费质保。第1.7条
p.1
Pending
8故障报修后必须在2小时内响应,并在24小时内给出处理方案。第1.8条
p.1
Pending
9所有业务数据必须存储在中国大陆,未经书面许可不得向境外传输。第2.1条
p.2
Pending
10系统必须提供操作审计日志,日志保存期限不少于180天。第2.2条
p.2
Pending
11系统必须支持每日自动备份,并至少每季度开展一次恢复演练。第2.3条
p.2
Pending
12供应商必须在交付时完成2场培训,每场不少于2小时。第2.4条
p.2
Pending
13投标文件应包含实施计划、验收方案和逐条技术响应表,三项均为必交材料。第2.5条
p.2
Pending
14验收必须执行连续72小时稳定性测试,测试通过后方可申请最终验收。第2.6条
p.2
Pending
15投标人必须在2026年11月20日17时前提交PDF投标文件。第2.7条
p.2
Pending
16如存在负偏离,必须在偏离表逐项列出,不得仅写完全响应。第2.8条
p.2
Pending

3. Review nine inconsistency and missing-item alerts

Open bid checker →

Conflicting project IDs

Source page 1

项目编号:DEMO-2026-1103

发现不同值:DEMO-2026-1103 / DEMO-2026-1108。请对照原始依据确认后统一;其他位置:项目编号:DEMO-2026-1108

Conflicting bidder names

Source page 1

投标人:晨光演示科技有限公司(虚构)

发现不同值:晨光演示科技有限公司 / 晨光演示信息有限公司。请对照原始依据确认后统一;其他位置:投标人:晨光演示信息有限公司(虚构)

Conflicting total prices

Source page 1

含税总报价为人民币198000.00元,大写壹拾玖万捌仟元整

发现不同值:198000 / 180000。请对照原始依据确认后统一;其他位置:分项合计:180000.00元

Conflicting delivery periods

Source page 1

交付期限:合同签订后30个日历日

发现不同值:30 / 45。请对照原始依据确认后统一;其他位置:第1至15天需求调研,第16至35天部署,第36至45天测试,合同签订后第45天交付

Conflicting validity periods

Source page 1

投标有效期:自2026年11月20日起90日

发现不同值:90 / 60。请对照原始依据确认后统一;其他位置:本投标文件有效期为自2026年11月20日起60日

Conflicting warranty periods

Source page 1

质保期限:36个月

发现不同值:36 / 24。请对照原始依据确认后统一;其他位置:免费质保期限为24个月

Conflicting response times

Source page 1

故障响应:2小时内响应,24小时内提供处理方案

发现不同值:2 / 24。请对照原始依据确认后统一;其他位置:故障报修后24小时内响应,48小时内提供处理方案

Conflicting resolution times

Source page 1

故障响应:2小时内响应,24小时内提供处理方案

发现不同值:24 / 48。请对照原始依据确认后统一;其他位置:故障报修后24小时内响应,48小时内提供处理方案

Explicitly missing authorization

Source page 2

本次实际附件:只有营业执照信息占位页;未附法定代表人授权书,授权代表姓名空缺

补充授权书并核实授权代表信息;待提供的材料不能标记为已齐全。

4. Complete the draft with the responsible reviewer

The sample Word file contains source requirements, 16 pending responses, a proposed plan and placeholders for bidder identity, pricing, qualifications and authorization. A draft does not verify capability, attachments or final formatting. PDF export uses browser printing and was not file-verified in this example.

Open bid draft tool →

Companion working guides

Questions before you use these resources

Can I upload a confidential RFP to the free tool?

No. The free tool is limited to public or fictional material without confidential or personal information. Providers may retain it and use it for training. Explicit acknowledgement is required before processing.

Can AI confirm that a requirement is compliant?

Generated output is not proof of compliance. A responsible reviewer must check the actual proposal and evidence before recording status. Verify qualifications, pricing, signatures and attachments yourself.

How should I handle an RFP amendment?

Keep the previous source and workbook. Extract the new version and compare added, removed and changed clauses. Row IDs can change between extractions, so do not match requirements by row number alone.

Ready to organize a public RFP?

Public or fictional material only. Review the output yourself.

Open free matrix tool →